In Coins ERP+, each Contract analysis is made up of three or four elements: the contract code, an optional phase code, the cost code and the cost category. For example:
A1004 | . | 02 | . | ABM1007 | . | MA |
Contract | Phase | Cost Code |
| Category |
|
|
See Cost Codes
The maximum length of the entire analysis code, including the full stops and company separator, can be between 19 and 30 characters. (The maximum length can be configured; the default is 19.) There are also limits on the lengths of the individual elements:
Element | Maximum Length | Purpose |
Contract code | 8 | Identifies the contract (or the development, in a house building context). |
Phase code | 2 | Provides a way of dividing large contracts into smaller units. |
Cost code | Configurable between 8 and 16 characters | Identifies the different types of cost on a contract. |
Cost category | 2 | Allows you to analyse costs further into up to six categories, such as labour, materials, and so on. |
Contract Code
The contract code identifies the contract (or the development, in a house building context). Each contract has a different code. The contract code can be any combination of up to eight letters or numbers. You define the contract code for the contract when you set up a new contract record using contracts, unless you are linking to the Project Information Workbench, in which case the contract number is defined there.
Using Contract Analysis Sets to Manage Phased Contract
We strongly recommend using analysis sets to manage phased contracts, rather than using the old phase functionality.
The analysis set approach is to set up separate contracts in Coins ERP+ that correspond to each of the "phases", and use a contract analysis set to relate these contracts together (for example, as a single site).
Setting Up Analysis Sets for Phased contracts:
In Contract Analysis Sets, use the selector to show the sites list, and set up the codes for sites.
Screenshot: Set up of sites
In JC Configuration, create a contract analysis set to represent "Site". If there is a relationship between the codes for contracts on the same site, you can set up Coins ERP+ to populate the analysis set automatically based on the contract code. In the example below, the site number is linked to the first four characters of the contract number.
Screenshot: Set up of contract analysis sets
Set up contracts for each phase. The following screen shows a list of phased contracts with one site split into two phases
Screenshot: List of contracts
The following screen then shows how a contract is linked to the site using the analysis set.
Site analysis set on a contract
If you have set up the "Site" analysis set so that is can be derived from the contract code, the Site field will have been filled in automatically; if not, you will need to select the site manually.
Phase
The phase code provides a way of dividing large contracts into smaller units. Phases are optional -- some contracts may be divided into phases while others are not, and those contracts that use phases can use different ones.
The phase code can be up to two characters long.
You define whether a contract uses phases in contracts, and define the phase codes for a contract using Phases (on the Options menu for the contract within contracts).
We do not advise you to use phases; they are provided in Coins ERP+ for compatibility with earlier versions, but are not fully supported in all areas of Coins ERP+. We recommend using analysis sets to summarise contracts.
Cost Codes
Each cost code identifies a different type of cost on a contract. It can show where (the section), how (the activity), and with what (the cost head) the cost was incurred.
The cost code can be any combination of up to ten letters or numbers. The length and structure of the cost codes you use depend on the extent to which you need to analyse costs. For example, you may only need one cost code for materials, or you may want different cost codes for each different type of material.
Although cost codes on each contract may be different, in practice several contracts will use the same costing analysis. Coins ERP+ allows you to generate the cost codes on a contract from a set of standard cost heads (see cost heads).
The cost code can also optionally include parts of the WBS code: the section (typically a subdivision of the work, such as a physical area, that will usually be specific to one contract), and/or the activity (typically a type of work, such as roadworks, earthworks or excavation).
For housebuilding contracts, the section corresponds to the lot, allowing you to record some costs against lots and some against sites. In this case activities are not used and the lot (section) comes after the cost head.
To create cost codes:
There are different ways to create the cost codes for a contract:
You can set up cost codes manually using Cost Codes (on the Options menu in contracts).
If the cost codes you are using on a contract are identical to the standard cost heads (that is, you are not using sections and activities), you can copy some or all of the standard cost heads to the contract (using Copy Cost to Contract), so that they are set up in advance.
This procedure is not required if AUTOCH is set to Y, unless you want a full list of cost heads against a contract before they are first used by a transaction.
You can "auto-generate" the cost codes (using Auto Generate Costcodes), so that all valid combinations of section, activity and cost head are copied to the contract.
You can allow Coins ERP+ to create each cost code automatically, as it is needed.
If the parameter AUTOCH is set to Y, the first time a user tries to enter a transaction to a cost code on that contract, Coins ERP+ creates the cost code automatically, as long as it is allowed by the classes you have set. In this way, cost codes are only created as they are needed.
Closing cost codes
You can close cost codes after the associated work is complete using Open/Close Cost Codes.
cost heads and cost codes
You define a set of standard cost heads (using Standard Cost Heads) and a table of standard activities (using Contract Standard Activities). If needed, you can also define contract-specific activities for individual contracts (using Activities on the options menu within contracts for the contract).
Cost Categories
The cost category allows you to analyse costs further into up to six categories, such as labour, materials, and so on. Each cost category can be any combination of up to two letters or numbers. The cost categories apply across the whole company.
Cost category configuration
You define the cost categories as part of the JC Configuration procedure, and define default categories for standard cost heads in Standard cost heads. If you do not use all six cost categories initially, you can add them at any time. If you need to change or delete a cost category code which has had transactions entered against it, you must consult The Access Group for advice.
Valid Cost Codes
Coins ERP+ builds up cost codes by combining section, activity and cost head (see Cost Codes). When Coins ERP+ generates cost codes automatically, either using Auto Generate Costcodes, or when a user enters a previously unused cost code, it checks that the combination of section, activity and cost head is valid, based on cost head classes and activity classes.
Each cost head and each activity can be assigned to a class. These represent groups of cost heads or activities that belong together. For example, you might have a class of general cost heads that will be appropriate for all contracts, and other classes for cost heads that are specific to different types of contracts.
For each contract, section and activity, you can specify which cost head classes are allowed.
For each section, you can specify which cost head classes and which activity classes are allowed.
In order for a combination of cost head, activity and section to be a valid cost code, the cost head Class(es) lists on the activity, the section, and the contract must all contain the class to which the cost head belongs, and the Activity Class(es) list on the section must contain the class to which the activity belongs.
These rules do not apply to cost codes you create by copying standard cost heads or entering them manually.
To set up cost head classes:
Use cost head Classes to set up the list of cost head classes.
When maintaining a cost head, select the Class to which the cost head belongs.
When maintaining a contract, enter a can-do list of the cost head classes that are valid on the contract, using the cost head Classes field on the Cost & WBS Codes tab.
When maintaining a section, enter a list of cost head classes and activity classes that are valid on the section.
When maintaining an activity code, enter a can-do list of the cost head classes which are valid on the activity.
To set up activity classes:
When maintaining an activity code, enter the activity Class.
Activity classes are free-text codes; there is no pre-set list of the codes you can use.
When maintaining a section, enter a list of activity classes that are valid on the section.
Account Masking
Coins ERP+ derives the General Ledger account for a cost from both the contract-specific cost code and the contract on which it is used. The cost code and contract can both specify an account mask; the masks identify, in full or in part, a General Ledger account.
To take a simple example, if part of the account code denotes the region (01 - North, 02 - West, 03 - South) and part of the code denotes the type of cost (1200 - materials costs; 1300 - labour costs; 1400 - subcontract costs), contracts would be set up with account masks according to their region:
Northern contracts would have 01._ _ _ _
Western contracts would have 02._ _ _ _
Southern contracts would have 03._ _ _ _
and cost heads would be set up with account masks against the appropriate categories according to the type of cost:
Material cost heads would have _ _.1200 against the material category
labourcost heads would have _ _.1300 against the labour category
Subcontract cost heads would have _ _.1400 against the subcontract category
Then when a material cost is recorded on a northern contract, the masks would combine so that the cost is recorded against account 01.1200.
The mask on the cost code defaults from the mask on the standard cost head on which the cost code is based. However, if you subsequently change the mask on a cost head, this will not affect the mask on any cost codes based on it.
You can set masks on the Group, Type, and Location records (typically for different parts of the account code). The Group, Type, and Location specified on a contract will then build up the account code masks on the GL Codes tab in {Jc Contract} Details. You can override individual accounts on the GL Codes tab (but note that if you subsequently change the Group, Type, or Location, the relevant part of the account mask will be re-set).